GEZE ECdrive T2 Installation and Service Instructions - Section 4 Overview

4.1 Diagrams

The following diagrams outline the drive drawings and installation diagrams for various configurations of the ECdrive T2 system.

Table 4.1: List of relevant drawings and diagrams
Drawing no. Type Name / Description
70518-0-001 Drive drawing ECdrive T2, drives
70518-ep01 Installation diagram ISO (toughened safety glass) glass fitting, 1-leaf
70518-ep02 Installation diagram ISO (toughened safety glass) glass fitting, 2-leaf
70518-ep03 Installation diagram ESG (toughened safety glass) glass fitting, 1-leaf
70518-ep04 Installation diagram ESG (toughened safety glass) glass fitting, 2-leaf
70518-ep17 Installation diagram ISO (toughened safety glass) post-rail construction 1-leaf
70518-ep18 Installation diagram ISO (toughened safety glass) post-rail construction 2-leaf
70518-ep19 Installation diagram ESG (toughened safety glass) post-rail construction 1-leaf
70518-ep20 Installation diagram ESG (toughened safety glass) post-rail construction 2-leaf
70518-ep21 Installation diagram ISO Lock A 1-leaf
70518-ep22 Installation diagram ISO Lock A 2-leaf
70518-ep23 Installation diagram ISO Lock M 1-leaf
70518-ep24 Installation diagram ISO Lock M 2-leaf
70518-ep33 Installation diagram ISO post-rail construction Lock A 1-leaf
70518-ep34 Installation diagram ISO post-rail construction Lock A 2-leaf
70518-ep35 Installation diagram ISO post-rail construction Lock M 1-leaf
70518-ep36 Installation diagram ISO post-rail construction Lock M 2-leaf
70518-ep37 Installation diagram Protective leaf attachment
70518-ep38 Installation diagram ISO-ESG (toughened safety glass) side panel on site
70518-ep39 Installation diagram Wooden leaf on site 1-leaf
70518-ep40 Installation diagram Wooden leaf on site 2-leaf
70484-ep04 Installation diagram Safety leaf for sliding door drives
70518-2-0203 Component drawing Cover 100 × 132
70518-2-0204 Component drawing Cover 150 × 132
70715-1-0159 Assembly group drawing Continuous floor guide
Note: The diagrams are subject to change without notice. Use only the most recent version.

4.2 Tools and Aids

Ensure you have the following tools available for installation and service:

Table 4.2: Required tools and specifications
Tool Size / Specification
Tape measure -
Marking pen -
Torque spanner -
Allen key 2 mm, 2.5 mm, 3 mm, 4 mm, 5 mm, 6 mm
Open-ended spanner 8 mm, 10 mm, 13 mm, 15 mm
Screwdriver set Slotted up to 6 mm; Phillip’s head PH2 and PH4
Torx key Tx 20; bit length at least 110 mm
Side-cutting pliers -
Crimping pliers for cables -
Wire stripper -
Display programme switch Service terminal ST220 / GEZEconnects
Ring spanner 8 mm, 10 mm

4.3 Torques

The specific torque values are provided with each respective installation step in the full manual.

4.4 Components and Assembly Groups

Please refer to the ep-drawing for the required installation situation and specific drive drawings referenced in Table 4.1.