6.1 Connecting the drive

Preparation of Cables

Note: Remove the sheath from the mains cable max. 40 mm.

Stripping the mains cable dimensions
  • Strip the mains cable:
    • Sheath removal length: 40 mm
    • Stripping length: 9 mm
    • PE line lead: 10 mm
  • Connect the drive to the 230 V mains network.
  • Turn on the main switch on the transformer.
  • Insert the battery connector at the control unit.
  • Carry out the production test as described in the wiring diagram “Automatic sliding doors DCU1-NT/DCU1-2M-NT”.

6.2 Mounting the cover

Unscrew the red locking pin from the toothed belt locking (optional) before mounting.

6.2.1 Drill a hole for the toothed belt locking (optional)

The position of the hole must be checked. Depending on the positioning of the drive components, minor deviations can occur here. Dimensional specifications for dimension C can be found in the component drawing for the cover.

  • Drill a hole Ø 20 mm.
  • Deburr the hole.

6.2.2 Mounting the cover fixing

To guarantee the stability of the cover, cover fixings must be mounted to the track. The number and installation position depends on the length of the drive.

Cover fixing requirements based on drive length
Drive length Number of cover fixings
up to 4000 mm 2
4001 mm – 5000 mm 3
5001 mm – 6000 mm 5

Installation Position Diagrams

[Refer to technical diagrams defined for drive lengths 4000mm, 5000mm, and 6000mm in original manual]

Inserting cover fixing

  • Set the cover fixing onto the track.
  • Secure the cover fixing using a screw.

6.2.3 Fitting the cover earthing

  • Before installing the cover earthing, check whether the cover suspension piece has been fitted.
  • Knock the locating pin for the cover earthing on the side of the earthing approx. 30 mm into the upper screw duct.

6.2.4 Hook the cover safety rope in place

  • Hook the cover safety rope on the cover suspension piece in the cover.
  • Hook the cover safety rope on the suspension piece of the side panels.

6.2.5 Connecting cover earthing

  • Connect the earthing cable of the cover using the plug-in connection of the device flat plug.

Depending on the length of the drive, a 2nd device flat plug for the cover earthing is installed in order to bridge the distance between the transformer ground and the cover earthing.

6.2.6 Sliding on the cover

  • Slide the cover onto the side panels until it latches in and ensure that it is also seated correctly in the area of the track and cable guides.
  • Check the correct position of the cover safety ropes and the earthing wire. There must not be any contact with moving parts.
  • Turn the locking pin into the tooth belt locking mechanism (optional).

After mounting, the locking pin must be positioned above the hole in the cover so that the locking mechanism can be locked and unlocked.

  • If necessary, enlarge the drill hole in the cover.

6.3 Mounting the safety devices

For information about connection and parameter setting of the safety sensors, and the inputs and outputs and on commissioning, please refer to the wiring diagram.

  • Mount safety and activation equipment.
  • Route cables properly in cable ducts. For electrical installation, see wiring diagram.

6.4 Installing operating elements/switches/push buttons

For electrical installation, see wiring diagram.

  • Install the operating elements so that users cannot stand in dangerous areas.

6.5 Commissioning the door system

For information about connection and parameter setting of the safety sensors, and the inputs and outputs and on commissioning, please refer to the wiring diagram.

6.5.1 Creating test log

  • Carry out a safety analysis.
  • Record installed options in the safety analysis for the owner.

6.6 Dismantling

Dismantling is done in the reverse order of installation.