News

GEZE Slimdrive SL NT Manual: Installation & Service

Next section

Next page: →
GEZE Slimdrive SL NT Installation & Service Guide

4 Overview

4.1 Diagrams

Number Type Name
70511-0-001 Drive drawing GEZE Slimdrive SL NT, drives
70511-ep01 Installation diagram Slimdrive SL NT /-FR, ISO-glass fitting
70511-ep03 Installation diagram Slimdrive SL NT /-FR, ISO-glass fitting
70511-ep05 Installation diagram Slimdrive SL NT/-FR, IGG-door fitting
70511-ep06 Installation diagram Slimdrive SL NT /-FR with GGS
70511-ep07 Installation diagram Slimdrive SL NT with protective leaf
70511-ep08 Installation diagram Slimdrive SL NT/-FR, wooden leaf
70511-ep13 Installation diagram Slimdrive SL NT /-FR, ISO-glass fitting + hook lock
70511-ep16 Installation diagram Slimdrive SL NT & Lock A, 2-leaf
70511-ep17 Installation diagram Slimdrive SL NT & Lock A, 1-leaf
70511-ep18 Installation diagram Slimdrive SL NT /-FR, Lock M, 2-leaf
70511-ep19 Installation diagram SL NT /-FR, Lock M, 1-leaf
70511-ep21 Installation diagram Slimdrive SL NT /-FR, ISO-glass fitting, Lock M
70504-ep03 Installation diagram Floor lock for ISO
70484-ep04 Installation diagram Safety leaf for sliding door systems
70511-2-0209 Component drawing Track, bespoke, SL NT
70511-2-0231 Component drawing Track, drilled, SL NT
70511-2-0281 Component drawing Track, bespoke, SL NT 2-leaf, GGS with fixed panels
70511-2-0282 Component drawing Track, bespoke, SL NT 1-leaf, left hand slide to open, GGS with fixed panel
70511-2-0283 Component drawing Track, bespoke, SL NT 1-leaf, right hand slide to open, GGS with fixed panel
70511-2-0228 Component drawing Connecting profile roller carriage
70511-2-0200 Component drawing Cover, bespoke, SL NT
70511-1-0107 Component drawing Module mount right, DCU1-NT, SL NT
70511-1-0108 Component drawing Module mount right, SL NT -FR 2M / -FR DUO
70511-1-0109 Component drawing Module mount right, SL NT -FR LL/ -FR RWS
70511-1-0106 Component drawing Module mount left SL NT and locking mechanism
70511-1-0117 Component drawing Module mount left, SL NT
70715-1-0159 Assembly group drawing Continuous floor guide
70715-9-9854 Installation drawing ISO leaf Slimdrive SL NT
70715-9-9864 Installation drawing ISO leaf, rubber secondary closing edge, Lock M, Slimdrive SL NT
70715-9-9863 Installation drawing ISO leaf, rubber secondary closing edge, Lock A, Slimdrive SL NT

The diagrams are subject to change without notice. Use only the most recent version.

4.2 Tools and Aids

Tool Size / Details
Tape measure
Marking pen
Torque spanner
Allen key 2 mm, 2.5 mm, 3 mm, 4 mm, 5 mm, 6 mm
Open-ended spanner 8 mm, 10 mm, 13 mm, 15 mm
Ring spanner 8 mm
Screwdriver set Slotted up to 6 mm, cross-slot PH2 and PZ2
Torx key Tx 20 (bit insert length at least 110 mm)
Side-cutting pliers
Crimping pliers for cables
Wire stripper
Plastic bottle as tip safeguard
Display programme switch / Service terminal ST220 / GEZEconnects

4.3 Torques

The torques are given at the respective installation step.

4.4 Components and Assembly Groups

See the ep-drawing for the required installation situation and drive drawings.

5 Installation

WARNING! Risk of fatal injury due to electric shock!
  • Do not loosen screwed electric protective earth connections.
  • Secure workplace against unauthorised entry.
  • Always work with a second person.
  • Use a stepladder or stepstool.
  • Keep inside area of track clean.

5.1 Preparations to be made on-site

Check the preparations made on-site by the customer to ensure proper installation:

  • Type and load capacity of the façade construction or suspending frame
  • Evenness of the installation surface
  • Evenness of the finished floor level
  • Cable plan requirements

5.2 Preparing the track

Pre-mounted systems are delivered with attached module mount.

  • Remove the module mounts to make it easier to fix the track to the wall.

5.3 Mounting the track

  • Protect the running surface from damage.

5.3.1 Mounting the intermediate plates

  • Clip the intermediate plates (1) onto the rear of the track.
  • Upper row of drill holes for wall installation.
  • Lower row of drill holes for the clip of the intermediate plate.

Mounting can also be carried out conversely depending on the building structure (post design). Use the upper row of drill holes for fixing if possible.

5.3.2 Install the track

View from the side

  • Determine the installation height of the track (2). Take unevenness of wall and floor into account.
  • Align the track horizontally.
  • Mark the fastening drill holes (1) (upper row of drill holes on the track).
  • Remove the track.
  • Drill the holes (1) for fixing.
  • Install the brush profile with brush (3).
  • Screw the track (2) in place.
  • Install the sealing profiles (4).
  • Press rubber seal into the draught sealing profiles.

With 1-leaf systems:

  • Install the wall strips (5).

5.4 Mounting the floor guide

The selection of floor guide depends on the on-site conditions. One of the following floor guide options must be used. For further information see the respective installation drawing, Chapter 4.1.

5.4.1 Fitting angled floor guide for floor mounting (option)

Angled floor guide with moving leaf left hand slide to open:

  • Screw the angled floor guide (6) in place using 2 suitable countersunk screws (1) and (2).

Angled floor guide with moving leaf right hand slide to open:

  • Screw the angled floor guide (6) in place using 2 suitable countersunk screws (3) and (2).

Legend:

  1. Countersunk screw for moving leaf left hand slide to open
  2. Countersunk screw
  3. Countersunk screw for moving leaf right hand slide to open
  4. Outside
  5. Inside
  6. Angled floor guide

5.4.2 Adjustable angled floor guide for wall mounting (option)

  • Screw the fixing bracket (2) to the fixed panel (1) using two screws (5) (torque 5 Nm).
  • Align the moving leaf (6) and thus the adjusting angle (4) and tighten the screw (3) (torque 3 Nm).
  • If there is no fixed panel available, mount the floor guide on the wall using suitable attachment material.

5.4.3 Continuous floor guide (option)

  • See the component drawing "Continuous floor guide" on how to install the continuous floor guide.
  • For further information see the respective installation diagrams, Chapter 4.1.

5.5 Installing the moving leaf

5.5.1 Fit the connecting arm

WARNING! Danger of injury due to glass breakage.
  • Always install the moving leaves together with another person.
WARNING! Danger of crushing!

The moving leaves are still unsecured and move easily.

  • Ensure that the moving leaves are not moved accidentally or by unauthorised persons.

1-leaf

  • Slide the clamping plate (1) into the connecting arm (only for 1-leaf doors).
  • Slide the roller carriage (2, 4) into the connecting profile (3).
  • Secure both roller carriages (2, 4) with 2 setscrews (5) each (torque 3 Nm).

2-leaf

  • Secure the roller carriage (towards the secondary closing edge) with setscrews (5) (torque 3 Nm).
  • Fasten the second roller carriage (towards the main closing edge) with the two screws for the driver (torque 5 Nm).
  • The angled part (7) of the connecting arm must be facing the main closing edge.

5.5.2 Inserting roller carriage into the track

  • Insert roller carriage (2) into the track (1).
  • Insert the moving leaf mounting aid (3) to secure the roller carriage in the track.
  • Slide the track-supporting rollers (4) upwards and tighten slightly using screws (5).

5.5.3 Install the supporting brackets on the moving leaf

The supporting brackets are installed during glazing of the moving leaves. In case of subsequent installation of the supporting brackets, the frames of the moving leaves must be dismantled (see installation instructions for moving leaves).

  • See installation drawing for the moving leaf for the position of the supporting brackets (1).

5.5.4 Fitting the moving leaves

WARNING! Danger of injury caused by moving leaf falling over

The moving leaves are very heavy.

  • At least 2 people should work together to set up the moving leaf.
  • Use 4 suspension bolts (1) to screw the moving leaf to the roller carriage, do not tighten these yet.
  • Remove the moving leaf mounting aid.

5.5.5 Adjusting the moving leaves

WARNING! Danger of injury caused by crushing!

The moving leaves are still unsecured and move easily.

  • Make sure that the moving leaves are not moved accidentally or by unauthorised persons.
  • Observe the applicable standards and guidelines on crushing, shearing and drawing-in spots.

Adjust the parallel position and height of the moving leaves:

  • Use the suspension bolts (1) to align the door moving leaves flush. Ensure the same level and parallel closing edges when doing so.
  • Loosen the fixing screw for the height adjustment (2) and use the adjustment screw (3) to adjust the moving leaf height.
  • 2-leaf: Adjust the height of both moving leaves.
  • Tighten the screws (2) (torque 20 Nm).
  • Tighten the screws (1) (torque 10 Nm).
  • Tighten the screw (3) (torque 5 Nm).
  • Note the shearing and pinching spots in accordance with DIN 18650 and DIN EN 16005, see safety analysis and diagrams in Chapter 4.1.
  • Make the individual moving leaf move smoothly.

Adjusting the counter-roller:

The counter-roller (4) must have an upper clearance of 0.5 mm to the track (corresponds approximately to the thickness of 4 sheets of copy paper).

  • Loosen the screw (5) on the rear of the counter-roller.
  • Move the counter-roller until a clearance of approx. 0.5 mm is set.
  • Tighten the screw (5) again (torque 10 Nm).

5.5.6 Mounting the short driver

Drivers must not touch any obstacle over the entire travel path. See the drive drawing for the precise position of the driver.

1-leaf:

  • Mount the short driver (2) to the clamping plate (3) using 2 screws (1).
  • Position the clamping plate (3) and short driver (2) on the connecting arm (see drive drawing for position).
  • Tighten the screws (1) (torque 5 Nm).

2-leaf:

  • Use 2 screws to screw the short driver (1) through the outer oblong holes to the left roller carriage (2) on the right moving leaf (torque 5 Nm).

5.5.7 Install the long driver (2-leaf)

  • Use 2 pre-mounted screws to screw the long driver (1) through the outer oblong holes to the right roller carriage (2) on the left moving leaf (torque 5 Nm).
  • Position the moving leaf in the closed position.
Previous
GEZE Slimdrive SL NT: Installation & Safety Guide
Next
GEZE Slimdrive SL NT Drive Components Installation Guide

Leave a Comment

Your email address will not be published.