GEZE Powerdrive Pre-Mounting Instructions

5 Pre-mounting

The up-to-date drive drawing is applicable for the pre-installation work to be carried out. All components must be identified and installed in accordance with the drive drawing.

5.1 Machining the track and cover

  • Check profiles for damage.
  • Cut the track and cover to the required length (see machining drawings, Chapter 4.1).
  • Check whether additional bore holes are necessary (see machining drawing for bespoke track, Chapter 4.1).
  • Clean the track after machining.

5.2 Preparing the track

  • Slide sliding blocks (3) and earthing jumpers (1) into the mounting groove in accordance with the drive drawing. Heed the sequence.
  • Use 2 setscrews (2) to screw the earthing jumper (1) tight (torque 4 Nm).

5.3 Installing stop buffers

  • Slide the stop buffers (1) onto the track from the left and right.
  • Tighten the Allen screws (2) of the stop buffer slightly.

Note: The exact position of the stop buffers (1) is specified during moving leaf installation.

5.4 Connecting the contact on the toothed belt locking (optional)

  • Remove the screws (2) on the feedback switch (1) of the tooth belt locking mechanism.
  • Place the alarm contact switch (3) on the feedback switch (1).
  • Fasten both switches with the longer screw (2) from the retrofitting set on the tooth belt locking mechanism.
  • Connect the cable for the tooth belt locking mechanism.
  • Shorten the switching flag of the alarm contact switch if necessary.

5.5 Installing the drive components

The exact positioning of the components is given on the drive drawings.

  • Illustrated: 2-leaf, ÖW 900 mm
  • Illustrated: right hand slide to open, ÖW = 700 mm
  • Illustrated: left hand slide to open, ÖW = 700 mm
Legend:
ÖW
Opening width
U1
Position of the deflection pulley (measured from the middle)
U2
Position of the motor gear unit
UR
Position of the deflection pulley (measured from the side)
Vrs
Extension left
Vls
Extension right

When the drive is extended (Vls / Vrs) the positions of the components must be adapted accordingly.

  • Push the sliding blocks into the track from the right. For the arrangement, see the drive diagram.
  • Install the components with the screws provided in accordance with the drawing.
Torque Specifications:
  • Deflection pulley torque: 15 Nm
  • Torque for other components: 10 Nm

5.6 Installing cable guides

Caution: Cables can be cut!
  • Lay cables in such a way that there are no cables near the moving parts.
  • Cable guide spacing approx. 200 mm.
  • Fix the cable guide (1) on the track (2).

5.7 Connecting transformer and control unit

  • Make sure that cables are cut to length and routed in such a way that they do not become jammed when the cover is positioned and cannot come into contact with moving components.
  • Cut the three-wire cable (1) to length.
  • Strip both ends and attach insulated wire-end ferrules.
  • Attach the two plugs (3) to the control unit (2).
  • Plug the connector (3) into the control unit (2).
Important Notes:
  • Note earthing connection!
  • Do not mix up wires!
  • Fix the cable guide DCU (4) to the control unit.
  • Guide the transformer cable (1) between the control unit (2) and track (5).
  • Alternatively, the transformer cable (1) can also be mounted on the front of the control unit.
  • Fit the transformer cable (1) to terminal (5) of the transformer.